What are three parts to the inspect and adapt workshop?

What are three parts to the inspect and adapt workshop?

An Inspect and Adapt event consists of three distinct phases.

  • Phase 1: The PI system demo. In this phase, product management acts as the facilitator of the demonstration that covers the fully integrated system.
  • Phase 2: Quantitative measurement.
  • Phase 3: Retrospective and problem solving.

What is one of the six steps in the problem-solving workshop SAFe?

SAFe outlines a six-step agenda for the two-hour problem-solving workshop:

  • Agree on the problem to solve.
  • Apply root cause analysis (5 Whys)
  • Identify the biggest root cause using Pareto analysis.
  • Restate the problem for the biggest root-cause.
  • Brainstorm solutions.
  • Identify improvement backlog items.

Which scrum events provide the possibility to inspect and adapt?

Sprint review: A time-boxed event holds at the end of the Sprint to inspect the Increment and adapt the Product Backlog if needed. Sprint retrospective: A time-boxed event for providing an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint.

What are two areas of focus when coaching the inspect and adapt event?

What are two areas of focus when coaching the Inspect and Adapt (I&A) event? (Choose two.) When coaching the Inspect and Adapt (I&A) event, one should focus on ensuring that the event finishes with clear improvement items for the Program Backlog.

What are the SAFe principles?

Underlying principles of SAFe

  • Take an economic view.
  • Apply systems thinking.
  • Assume variability; preserve options.
  • Build incrementally with fast integrated learning cycles.
  • Base milestones on objective evaluation of working systems.
  • Visualize and limit work-in-progress, reduce batch sizes, and manage queue lengths.

What are two outputs PI planning?

A successful PI planning event delivers two primary outputs: Committed PI objectives – A set of SMART objectives that are created by each team with the business value assigned by the Business Owners. Program board – Highlighting the new feature delivery dates, feature dependencies among teams and relevant Milestones.

What is one of the six steps in the problem solving workshop quizlet?

Terms in this set (6)

  • identify the problem.
  • prove the problem exists.
  • what caused the problem.
  • what will happen if the problem continues.
  • brainstorm possible solutions.
  • decide on the best solution that doesn’t cause further problems.

What are six problem solving?

The six-step model is a tried-and-tested approach. Its steps include defining a problem, analyzing the problem, identifying possible solutions, choosing the best solution, planning your course of action, and finally implementing the solution while monitoring its effectiveness.

What are the 5 events in Scrum?

The Five Scrum Events

  • Sprint Planning.
  • Daily Scrum.
  • Sprint Review.
  • Sprint Retrospective.
  • The Sprint.

Which is activity happens in the inspect and adapt workshop?

Which activity happens in the Inspect and Adapt workshop? Which activity happens in the Inspect and Adapt workshop? Which activity happens in the Inspect and Adapt workshop? Q: Which activity happens in the Inspect and Adapt workshop?

What is the inspect and adapt event in agile?

The Inspect and Adapt (I&A) is a significant event, held at the end of each Program Increment (PI), where the current state of the Solution is demonstrated and evaluated by the train. Teams then reflect and identify improvement backlog items via a structured, problem-solving workshop. The Agile Manifesto emphasizes the importance …

When does the inspect and adapt ( I & a ) occur?

If you assume that things are all right the way they are, you can’t do kaizen. So change something! The Inspect and Adapt (I&A) is a significant event, held at the end of each Program Increment (PI), where the current state of the Solution is demonstrated and evaluated by the train.

Why is the inspect and adapt ceremony important in safe?

The importance of the Inspect & Adapt ceremony in SAFe™ cannot be understated. It enables every Agile Release Train (ART) to embody “relentless improvement” as referenced in the SAFe House of Lean, maintain its overall health and deliver ever-increasing business value.