Contents
What are the three parts to the inspect and adapt workshop?
An Inspect and Adapt event consists of three distinct phases.
- Phase 1: The PI system demo. In this phase, product management acts as the facilitator of the demonstration that covers the fully integrated system.
- Phase 2: Quantitative measurement.
- Phase 3: Retrospective and problem solving.
What are two areas of focus when coaching the inspect and adapt event?
What are two areas of focus when coaching the Inspect and Adapt (I&A) event? (Choose two.) When coaching the Inspect and Adapt (I&A) event, one should focus on ensuring that the event finishes with clear improvement items for the Program Backlog.
Which activity happens in the inspect and adapt workshop madanswer?
The Inspect and Adapt (I&A) is a significant event, held at the end of each Program Increment (PI), where the current state of the Solution is demonstrated and evaluated by the train. Teams then reflect and identify improvement backlog items via a structured, problem-solving workshop.
Which three items are found on a program board?
The Program Board is a visual summary of features or goals, deadlines and any cross-team dependencies that should be delivered by Agile Release Train. The program board is built in the Program Increment Planning session in which all ART’s team plan, estimate and prioritize features.
Who attends the Art Sync?
An Art-Sync meeting with all Product Owners, Scrum Masters, Product Managers and Program Manager within a program easily consists of 20 people. You don’t want to discuss every problem in detail in the large group.
What is one of the six steps in the problem-solving workshop?
SAFe outlines a six-step agenda for the two-hour problem-solving workshop: Agree on the problem to solve. Apply root cause analysis (5 Whys) Identify the biggest root cause using Pareto analysis.
What is found on a program board?
What are the parts of the inspect and adapt workshop?
The I&A workshop consists of three parts: 1 PI System Demo 2 Quantitative measurement 3 Retrospective and problem-solving workshop.
What are the parts of the I and a workshop?
The I&A workshop consists of three parts: PI System Demo Quantitative measurement Retrospective and problem-solving workshop.
Where can I find the inspect and adapt template?
You may not know it, but if you’re an SPC, then you have access to something called the SAFe Program Increment Toolkit from the Toolkits and Templates section of the Community site. The PI Toolkit has the Inspect and Adapt Event Template, which is a PowerPoint with all the steps needed to walk people through the entire I&A event.
When does the inspect and adapt ( I & a ) occur?
If you assume that things are all right the way they are, you can’t do kaizen. So change something! The Inspect and Adapt (I&A) is a significant event, held at the end of each Program Increment (PI), where the current state of the Solution is demonstrated and evaluated by the train.